List of Completed Projects of Petrosaz ab Company (PSA)
1. Project Manager “Consulting, preparing and submitting the Environmental Impact Assessment Report (EIA) of the LABS project of Bisoton Petrochemical Company” (2017)
2. • Project Manager “Collecting Industrial and non-industrial waste and transferring waste to salvage and outside of Arvand petrochemical complex” (2017-2018)
3. • Project Manager ” Courses on HSE managers of Persian Gulf Holding ” (2017 – 2018)
4. • Project manager “Consulting, preparing and submitting the Environmental Impact Assessment Report (EIA) of the Unit PBR II of Takht Jamshid Petrochemical Company” (2016-2017)
5. Project Manager “Arvand Petrochemical waste inspection and management by the environment’s trusted Inspector” (2014-2016-two separate contracts)
• Project Manager “Dredging operations of more than 30000 square meters of
marigold and construction of sludge drying-bed substrates, transporting and loading Sludge” (2014-2015-two separate contracts)
6. • Project manager “Displacement of firefighting tower Monitor of P3 jetty in terminals and petrochemical tanks company “-2014
7. • Project Manager “Construction platform for sub-docks Razi jetty(P7) of terminals and petrochemical tanks Company”-2014
8. • Project manager “Environmental pollution identification and diagrams of Takht Jamshid Petrochemical Company”-2014
9.
10.• Project Manager “design, procurement, construction and commissioning of CPI concrete unit loading terminal of CF Plant-Bandar Imam Petrochemical Co.(BIPC)”-2012-2014
11.The project entitled “Study of the output biogases reuse from the old burial site of wastes in Ahwaz city” completed.
12.The project entitled “Carrying out the effluent management, management of atmospheric pollutants and general environmental training of staff at Arvand Petrochemical Company”, ongoing.23
13.The project entitled “design, procurement and execution of the pre-treatment system for 2SSC canal of Fanavaran petrochemical company”, provisional handover.
14.The project entitled “Design, procurement, construction and commissioning of the multi-purpose wastewater treatment pilot plant at Fajr petrochemical company”.
15.Cooperation in the project entitled “operation of bi-fuel furnace for industrial wastes at Fajr Petrochemical Company
16.Project entitle” Management of effluents produced by Jooje Mahi Asia Company”, completed.
17.Project entitled” Rendering feasibility study and detailed design engineering services for the industrial wastewater of Razi Petrochemical Company”, Provisional hand-over
18.The project entitled” Carrying out the conceptual design, feasibility study and detailed design of the wastewater treatment system at BIPC”, completed.
19.Project entitled “design, procurement and construction of bi-fuel furnace for industrial wastes at Fajr Petrochemical Company”, completed.
20.Project entitled”Providing general environmental training services for all personnel of BIPC (3300 persons)”, completed.
21.Project entitled” Rehabilitation and renovation of the effluent pond of HD unit in Basparan petrochemical company- EPC (sub-contractor”, completed.
22.Project entitled” Identification and evaluation of the status of existing septic tanks in BIPC and proposing solutions for enhancement of their performance”, completed.
23.Project entitled “Management of wastes and the effluent of Razi petrochemical complex” (sub-contractor), completed.
24.Project entitled”Providing general environmental training services for all personnel of Razi Petrochemical Company (3000 persons)”, completed.
25.Project entitled” design, procurement and construction of the wastewater treatment system of Hazrat-e-Rasool Surgery Center of Mahshahr”, completed.
26.Project entitled” Construction of pilot industrial wastewater treatment system for the paper making unit in order to optimize the design and operation parameters”, completed.
27.The project entitled” Carrying out conceptual design, feasibility study and detailed design of the industrial wastewater treatment plant for Afrang-e-Noor
24 paper making company (Chamestan-e-Noor industrial town)” and supervision on procurement, installation of equipments and commissioning of the system”, completed.
28.The project entitled” Carrying out conceptual design, feasibility study and detailed design of the industrial wastewater treatment plant for Afrang-e-Noor paper making company (Chamestan-e-Noor industrial town)” and supervision on procurement, installation of equipments and commissioning of the system”, completed.
29.The project entitled “Effluent management of Fanavaran petrochemical complexconceptual studies”, completed.
30.The project entitled” Waste management at Fanavaran petrochemical complex, conceptual studies”, completed.
31.The project entitled” Training the personnel of Fanavaran Petrochemical Company for general environmental issues”, completed
32.The project entitle” Feasibility study and detailed design of the industrial water treatment system for Kablan cable manufacturing factory (Seman industrial town), completed
33.The project entitled” construction of pilot for biological treatment of wastewater produced by steel making industries in order to remove cyanide and determine the bio-synthetic coefficient”, completed